NewsGoldcrest Post Production London remodels its sound mixing Theatre 4

                    Goldcrest Post Production London remodels its sound mixing Theatre 4

                    Thursday, 13th November 2014

                    Goldcrest Post Production London recently remodelled its sound mixing Theatre 4. Designed by Munro Acoustics the room has had total make over including new screen, projector and most importantly a custom built Exigy speaker system.

                    Not only has the room been refurbished it has also increased in size by more than 30 cubic metres. As a result the room is now fully Dolby 5.1 / 7.1 certified. Since re opening Theatre 4 has seen a variety of projects go through its doors including Survivor and Tulip Fever. The room now also doubles as an ADR suite when Goldcrest's other 2 ADR theatres are at capacity.

                    SHARE:
                    曰逼